DMA At A Glance

Process Phase 1 Process Phase 2

How we work : Process flow

Project Initiation
  • Discussing & obtaining project requirements
  • Process flow
  • Services required
  • Land boundaries
  • Topography
  • Soil report
Concept Planning
  • Conceptualizing project plans as per building bylaws
  • Main approach, material & men movement
  • Waste disposal & utility services
  • Consideration of land shape, solar & magnetic direction, wind & water disposal
Site & Level Planning
  • Formulating levels of made-up ground vs natural ground
  • Roads & plinth level fixing
  • Rainwater & sewerage disposal planning
Architectural Design
  • Preparation of conceptual drawings for client approval
  • Detailed architectural drawings – plans, sections & elevations
  • Drawings sent to equipment/machine suppliers
  • Approval on architectural concepts
Detailed Design
  • Room programme preparation
  • Structural analysis & design (buildings & equipment foundations)
  • Preliminary & detailed cost estimates
Tender Stage
  • Draft tender documents – BOQ, specifications, conditions
  • Issuing of tenders
  • Receiving equipment & loading data from client
Coordination & Services
  • General Arrangement (GA) drawings for critical buildings
  • Designing of services & schematic approvals
  • Electrical, HVAC, mechanical & utility drawings
Contractor Finalization
  • Comparative statement & scrutiny report
  • Negotiation meetings & finalization of contractor
Execution – DAY ZERO
  • Mobilization of contractor to site
  • Issuing good-for-construction drawings
  • Periodic site visits & quality checks
Billing & Completion
  • Measurement verification & bill certification
  • Material reconciliation (cement & steel)
  • Issuing virtual completion certificate
  • Completion drawings & authority approvals
  • Project completion – 270 days from Day Zero